MATERIALGOODSRECEIPTDURATION in MRP_REQ_NOTE

Table Field WEBAZ

GR proc. time (DE: WE-BearbeitZt)

MATERIALGOODSRECEIPTDURATION is a field in SAP table MRP_REQ_NOTE (Requests and Notes for MRP Cockpit). It represents "GR proc. time". Data element: WEBAZ. Available in 4 CDS view(s) as GoodsReceiptDuration.

Business Meaning

Description (EN)GR proc. time
Beschreibung (DE)WE-BearbeitZt
Data ElementWEBAZ
Key FieldNo

CDS Views & Technical Names (4)

MRP_REQ_NOTE.MATERIALGOODSRECEIPTDURATION is exposed in CDS views under the following technical name. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.

GoodsReceiptDuration (4 views)

ViewAccessVDMReleaseDescription
I_MRPRequestNote direct BASIC MRP Request Note
I_MRPChangeRequest via 2 level COMPOSITE MRP Change Request
P_MRPChangeRequest via 2 level COMPOSITE
C_MRPChangeRequest via 3 levels CONSUMPTION MRP Change Request

Other Tables with Field MATERIALGOODSRECEIPTDURATION (6)

TableData ElementKeyDescription
MMPUR_EXT_EBAN WEBAZ Maintain Extracted Back-end Requisitions
MRP_SOL_VIEW WEBAZ MRP Solution View Cache Table
PPH_CACHE_MAT WEBAZ Cache Table Material
PPS_PR_ITEM_D WEBAZ Draft table for entity R_PPS_PURCHASEREQNITEMTP
PURREQNITM_D WEBAZ T_PURCHASEREQN T_PURCHASEREQNITEM
V_MRP_PURCH_DOC WEBAZ Generated Table for View