PLNKN in PLMZ
Task list node (DE: Planknoten)
PLNKN is a field in SAP table PLMZ (Allocation of bill of material items to operations). It represents "Task list node". Data element: CIM_PLNKN. Available in 24 CDS view(s) as BOOOperationInternalID, MasterRecipeOperationIntID, ProductionRoutingOpIntID.
Business Meaning
| Description (EN) | Task list node |
|---|---|
| Beschreibung (DE) | Planknoten |
| Data Element | CIM_PLNKN |
| Key Field | No |
CDS Views & Technical Names (24)
PLMZ.PLNKN is exposed in CDS views under the following technical names. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.
BOOOperationInternalID
(12 views)
Task list node number for operation
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| I_BOOOpBOMItemChangeState | direct | BASIC | Bill of Operations Operation BOM Item Change State | |
| I_BOOOpBOMItemInternalID | direct | BASIC | Bill of Operations Operation BOM Item Internal ID | |
| I_RoutingCompAllocSrchMod | direct | BASIC | Bill of Operations Operation BOM Item | |
| I_ChgAlertBOOOpBOMItmChgState | via 2 level | COMPOSITE | BOO Op BOM Item Chg State (Change Alert) | |
| I_MfgBOOOpBOMItemChangeState | via 2 level | BASIC | Manufacturing BOO Operation BOM Item Change State | |
| I_ProdnModOperationComponent | via 2 level | COMPOSITE | Production Model Operation Component | |
| I_RoutingComponentAlloc | via 2 level | COMPOSITE | Routing Component Allocation details | |
| I_MasterRecipeOperationBOMItm | via 3 levels | COMPOSITE | Master Recipe - Component Allocation Details | |
| I_ProductionRoutingCompAlloc | via 3 levels | COMPOSITE | Production Routing - Component Allocation | |
| R_ProdnModOperationComponentTP | via 3 levels | TRANSACTIONAL | Production Model Operation Component | |
| C_MatlProdnModOpComponentTP | via 4 levels | CONSUMPTION | Operation Component | |
| C_SlsOrdProdnModOpComponentTP | via 4 levels | CONSUMPTION | Operation Component |
MasterRecipeOperationIntID
(6 views)
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| I_MasterRecipeOpCompAllocTP | via 4 levels | TRANSACTIONAL | Master Recipe - Operation Comp Alloc | |
| I_MasterRecipePhseCompAllocTP | via 4 levels | TRANSACTIONAL | Master Recipe - Phase Comp Alloc | |
| A_MasterRecipeOpCompAlloc | via 5 levels | CONSUMPTION | Operation Component Allocation | |
| A_MasterRecipePhaseCompAlloc | via 5 levels | CONSUMPTION | Phase Component Allocation | |
| P_MasterRecipeOpCompAlloc | via 5 levels | COMPOSITE | Master Recipe - Operation Comp Alloc | |
| P_MasterRecipePhseCompAlloc | via 5 levels | COMPOSITE | Master Recipe - Phase Comp Alloc |
ProductionRoutingOpIntID
(4 views)
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| I_ProdnRoutingOpCompAllocTP | via 4 levels | TRANSACTIONAL | Transaction View for Production Routing Component Allocation | |
| R_ProdnRoutingOpCompAllocTP_2 | via 4 levels | TRANSACTIONAL | Production Routing Component Allocation | |
| A_ProductionRoutingOpCompAlloc | via 5 levels | CONSUMPTION | Component Allocation | |
| P_ProdnRoutingOpCompAlloc | via 5 levels | COMPOSITE | Production Routing Component Allocation |
TaskListOperationInternalId
(2 views)
Task list node number for operation
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| I_MaintTaskListOpMaterial | via 2 level | COMPOSITE | Maintenance Task List Operation Material | |
| C_ObjPgMaintTaskListOpMaterial | via 3 levels | CONSUMPTION | Maintenance Task List Operation Material |
Other Tables with Field PLNKN (17)
| Table | Data Element | Key | Description |
|---|---|---|---|
| MPE_OA_INSTANCE | PLNKN | Operation Activity Instance | |
| MPE_OA_PIC | PLNKN | KEY | Inspection Characteristic Assignment to Operation Activities |
| MPE_OPER_DETAILS | PLNKN | KEY | MPE Data for Operations |
| NJIT_REM_ASM_SEQ | PLNKN | JIT S2P - REM planned orders assembly sequence table | |
| PLAB | PLNKN | KEY | Relationships |
| PLAS | PLNKN | KEY | Task list - selection of operations/activities |
| PLFH | PLNKN | Task list - production resources/tools | |
| PLFT | PLNKN | KEY | Process Instructions |
| PLFV | PLNKN | KEY | PI Characteristics/Sub-Operation Parameter Values |
| PLMK | PLNKN | KEY | Inspection plan characteristics |
| PLMW | PLNKN | KEY | MAPL-Dependent Charac. Specifications (Inspection Plan) |
| PLPO | PLNKN | KEY | Task list - operation/activity |
| PLPO_TEXT | PLNKN | KEY | PLPO Long Text (Mapping) |
| PLWP | PLNKN | KEY | Allocation of maintenance packages to task list operations |
| QDQL | QPLNKNQL | KEY | Quality level |
| VCH_TR_P_RTG_OP | PLNKN | VCH Trace Parameter - Routing Operation parameters (LL) | |
| VCH_TR_P_RTG_PRT | PLNKN | VCH Trace Parameter - Routing PRT parameters (LL) |
Learn More
- Understanding Data Lineage in SAP S/4HANA
- SAP Tables vs CDS Views — Key Differences
- Understanding the SAP S/4HANA Data Model
- BSEG to ACDOCA: The Universal Journal Migration
- Business Partner Migration: KNA1/LFA1 to BUT000
- Material Document Migration: MSEG/MKPF to MATDOC
- How to Find the Right CDS View for an SAP Table
- Sales Document Status Migration: VBUP/VBUK Removal in S/4HANA
- CO Tables in S/4HANA: COEP, COBK, COSS, COSP to ACDOCA