P_EBWIP_OrderCost3
Event-Based Work In Process Order Cost layer 3
P_EBWIP_OrderCost3 is a Composite CDS View that provides data about "Event-Based Work In Process Order Cost layer 3" in SAP S/4HANA. It reads from 1 data source (P_EBWIP_OrderCost2) and exposes 34 fields with key fields CompanyCode, OrderID. Part of development package ODATA_CO_RT_WIP_REPORTING.
Data Sources (1)
| Source | Alias | Join Type |
|---|---|---|
| P_EBWIP_OrderCost2 | P_EBWIP_OrderCost2 | from |
Parameters (3)
| Name | Type | Default |
|---|---|---|
| P_KeyDate | fins_fperiod_enddate | |
| P_Ledger | fins_ledger | |
| P_CurrencyRole | fac_crcyrole |
Annotations (7)
| Name | Value | Level | Field |
|---|---|---|---|
| AbapCatalog.sqlViewName | PEBWIPORDCST3 | view | |
| AbapCatalog.compiler.compareFilter | true | view | |
| AbapCatalog.preserveKey | true | view | |
| AccessControl.authorizationCheck | #NOT_REQUIRED | view | |
| ClientHandling.algorithm | #SESSION_VARIABLE | view | |
| VDM.viewType | #COMPOSITE | view | |
| VDM.private | true | view |
Fields (34)
| Key | Field | Source Table | Source Field | Description |
|---|---|---|---|---|
| KEY | CompanyCode | CompanyCode | Receiver Company Code | |
| KEY | OrderID | OrderID | Order ID | |
| ObjectInternalID | ObjectInternalID | Object number | ||
| OrderDescription | OrderDescription | |||
| OrderType | OrderType | Order Type | ||
| OrderCategory | OrderCategory | Order Category | ||
| Material | Material | Vehicle Model | ||
| Plant | Plant | Valuation Area | ||
| ProfitCenter | ProfitCenter | Profit Center | ||
| ControllingArea | ControllingArea | Controlling Area | ||
| FunctionalArea | FunctionalArea | Sendr Fctl Area | ||
| StorageLocation | StorageLocation | StorageLocation | ||
| MRPArea | MRPArea | MRP Area | ||
| MRPPlant | MRPPlant | Plant | ||
| MfgOrderHasMultipleItems | MfgOrderHasMultipleItems | |||
| CombnOrdCombinationIdentifier | CombnOrdCombinationIdentifier | |||
| CombinedOrder | CombinedOrder | |||
| RequestOrderType | RequestOrderType | |||
| SuperiorOrder | SuperiorOrder | |||
| DisplayCurrency | DisplayCurrency | Display Currency | ||
| WIPCostInDspCrcy | WIPCostInDspCrcy | |||
| ReservesUnrealizedCostsAmount | ReservesUnrealizedCostsAmount | |||
| TotalWIPAmountInDspCrcy | ||||
| ProducedAmountInDspCrcy | ProducedAmountInDspCrcy | |||
| CompletedQuantityToDate | CompletedQuantityToDate | |||
| ActualOutputQuantity | ActualOutputQuantity | |||
| PlanCostAmountInDspCrcy | PlanCostAmountInDspCrcy | |||
| RatioUnit | ||||
| UnitOfMeasure | UnitOfMeasure | Unit Protected Qty | ||
| OrderPlannedTotalQty | OrderPlannedTotalQty | |||
| CreatedByUser | CreatedByUser | User Name | ||
| CreationDate | CreationDate | Time Stamp | ||
| LastChangedByUser | LastChangedByUser | User Name | ||
| LastChangeDate | LastChangeDate | Time Stamp |
Derived SQL interpretation, reconstructed from the parsed view metadata (data sources, associations, and field mappings). SAP annotations are omitted and the structure is reformulated as SQL — this is a functional approximation, not the verbatim SAP source.
-- Derived SQL interpretation of CDS view P_EBWIP_OrderCost3.
-- Reconstructed from parsed metadata (data sources, associations, fields).
-- SAP annotations are omitted and the structure is reformulated as SQL;
-- this is a functional approximation, not the verbatim SAP source. Some join
-- conditions may be unavailable and a few CDS constructs are kept as-is.
-- SQL view name: PEBWIPORDCST3
-- Parameters: P_KeyDate : fins_fperiod_enddate, P_Ledger : fins_ledger, P_CurrencyRole : fac_crcyrole
CREATE VIEW P_EBWIP_OrderCost3 AS
SELECT
CompanyCode,
OrderID,
ObjectInternalID,
OrderDescription,
OrderType,
OrderCategory,
Material,
Plant,
ProfitCenter,
ControllingArea,
FunctionalArea,
StorageLocation,
MRPArea,
MRPPlant,
MfgOrderHasMultipleItems,
CombnOrdCombinationIdentifier,
CombinedOrder,
RequestOrderType,
SuperiorOrder,
DisplayCurrency,
WIPCostInDspCrcy,
ReservesUnrealizedCostsAmount,
cast((WIPCostInDspCrcy + ReservesUnrealizedCostsAmount) as fco_eb_totalwipamt_in_dspcrcy) AS TotalWIPAmountInDspCrcy,
ProducedAmountInDspCrcy,
CompletedQuantityToDate,
ActualOutputQuantity,
PlanCostAmountInDspCrcy,
cast('%' as msehi) AS RatioUnit,
UnitOfMeasure,
OrderPlannedTotalQty,
CreatedByUser,
CreationDate,
LastChangedByUser,
LastChangeDate
FROM P_EBWIP_OrderCost2
;
Learn More
- VDM (Virtual Data Model) in SAP S/4HANA Explained
- Types of CDS Views: Basic, Composite, Consumption, and Transactional
- CDS View Annotations — A Complete Guide
- What Is a CDS View in SAP S/4HANA?
- SAP Tables vs CDS Views — Key Differences
- Understanding Data Lineage in SAP S/4HANA
- CDS View Field Mapping and Associations
- Understanding the SAP S/4HANA Data Model
- CDS View Extensions and Custom Fields in SAP S/4HANA
- Released APIs and Stability Contracts in SAP S/4HANA
- BSEG to ACDOCA: The Universal Journal Migration
- Business Partner Migration: KNA1/LFA1 to BUT000
- Material Document Migration: MSEG/MKPF to MATDOC
- How to Find the Right CDS View for an SAP Table
- BW Extractor to CDS View Migration Guide
- S/4HANA CDS View Deprecation: What You Need to Know
- ABAP CDS View Tutorial — From Basics to Real-World Examples
- RAP and CDS Views — Building Transactional Apps in SAP S/4HANA
- Sales Document Status Migration: VBUP/VBUK Removal in S/4HANA
- CO Tables in S/4HANA: COEP, COBK, COSS, COSP to ACDOCA