P_PCCCOSTESTIMATEITEM

CDS View

Production Costing Controlling: Cost Estimate into ACDOCP

P_PCCCOSTESTIMATEITEM is a CDS View in S/4HANA. Production Costing Controlling: Cost Estimate into ACDOCP. It contains 4 fields. 3 CDS views read from this table.

CDS Views using this table (3)

ViewTypeJoinVDMDescription
P_COMFGOrderTargetCube view inner COMPOSITE Target Costs Cube for Manufacturing Orders
P_PCCTgtCstForMTOCstEst view inner CONSUMPTION Target cost for MTO order based on cost estimate
P_PCCTgtCstForMTSOrder view inner CONSUMPTION Target cost for MTS Order

Fields (4)

KeyField CDS FieldsUsed in Views
KEY CompanyCode CompanyCode 1
KEY Ledger Ledger 2
KEY Material Material 3
KEY ProducedProduct ProducedProduct 1

Derived SQL schema, reconstructed from the indexed DDIC field metadata (field names, types, lengths and key flags) — a functional representation, not the verbatim SAP source.

-- Production Costing Controlling: Cost Estimate into ACDOCP
-- Derived schema, generated from indexed DDIC field metadata (not the verbatim SAP source).
CREATE TABLE P_PCCCOSTESTIMATEITEM (
    COMPANYCODE,
    LEDGER,
    MATERIAL,
    PRODUCEDPRODUCT,
    PRIMARY KEY (COMPANYCODE, LEDGER, MATERIAL, PRODUCEDPRODUCT)
);