I_CHANGERECORDMATERIALBOM

CDS View

Change Record Material BOM

I_CHANGERECORDMATERIALBOM is a CDS View in S/4HANA. Change Record Material BOM. It contains 6 fields. 2 CDS views read from this table.

CDS Views using this table (2)

ViewTypeJoinVDMDescription
I_ChangeRecordEngBOM view from COMPOSITE Change Record Engineering Bill Of Material
I_ChangeRecordMfgBOM view from COMPOSITE Change Record Manufacturing Bill Of Material

Fields (6)

KeyField CDS FieldsUsed in Views
KEY BillOfMaterialVariant BillOfMaterialVariant 2
KEY BillOfMaterialVariantUsage BillOfMaterialVariantUsage 2
KEY BillOfMaterialVersion BillOfMaterialVersion 2
KEY Material Material 2
KEY Plant Plant 2
HeaderValidityStartDate HeaderValidityStartDate 2

Derived SQL schema, reconstructed from the indexed DDIC field metadata (field names, types, lengths and key flags) — a functional representation, not the verbatim SAP source.

-- Change Record Material BOM
-- Derived schema, generated from indexed DDIC field metadata (not the verbatim SAP source).
CREATE TABLE I_CHANGERECORDMATERIALBOM (
    BILLOFMATERIALVARIANT,
    BILLOFMATERIALVARIANTUSAGE,
    BILLOFMATERIALVERSION,
    MATERIAL,
    PLANT,
    HEADERVALIDITYSTARTDATE,
    PRIMARY KEY (BILLOFMATERIALVARIANT, BILLOFMATERIALVARIANTUSAGE, BILLOFMATERIALVERSION, MATERIAL, PLANT)
);