ADATE in T811D
Date Performed (DE: Ausf.Datum)
ADATE is a field in SAP table T811D (Allocation Belegnummern). It represents "Date Performed". Data element: ADATE. Available in 2 CDS view(s) as PostingDate.
Business Meaning
| Description (EN) | Date Performed |
|---|---|
| Beschreibung (DE) | Ausf.Datum |
| Data Element | ADATE |
| Key Field | No |
CDS Views & Technical Names (2)
T811D.ADATE is exposed in CDS views under the following technical name. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.
PostingDate
(2 views)
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| I_AllocationDocument | direct | BASIC | Allocation Document | |
| P_AllocationDocument | via 2 level | CONSUMPTION | Allocation Document |
Learn More
- Understanding Data Lineage in SAP S/4HANA
- SAP Tables vs CDS Views — Key Differences
- Understanding the SAP S/4HANA Data Model
- BSEG to ACDOCA: The Universal Journal Migration
- Business Partner Migration: KNA1/LFA1 to BUT000
- Material Document Migration: MSEG/MKPF to MATDOC
- How to Find the Right CDS View for an SAP Table
- Sales Document Status Migration: VBUP/VBUK Removal in S/4HANA
- CO Tables in S/4HANA: COEP, COBK, COSS, COSP to ACDOCA