COMP_LEAD_TIME in PPH_DD_STPR_COMP
Individual Lead Time (DE: Ind. Durchlaufzeit)
COMP_LEAD_TIME is a field in SAP table PPH_DD_STPR_COMP (Stock Proposal BOM Component). It represents "Individual Lead Time". Data element: PPH_IND_LEAD_TIME. Available in 6 CDS view(s) as ComponentLeadTime, CurrentLeadTime, ProposedLeadTime.
Business Meaning
| Description (EN) | Individual Lead Time |
|---|---|
| Beschreibung (DE) | Ind. Durchlaufzeit |
| Data Element | PPH_IND_LEAD_TIME |
| Key Field | No |
CDS Views & Technical Names (6)
PPH_DD_STPR_COMP.COMP_LEAD_TIME is exposed in CDS views under the following technical names. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.
ComponentLeadTime
(2 views)
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| I_StockLevelPrpslBOM | direct | BASIC | Demand Driven BOM Component Lead Time | |
| A_StockLevelPrpslBOM | via 2 level | COMPOSITE | Longest Path in BOM |
CurrentLeadTime
(3 views)
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| P_CurrentBufferMatlBOM | via 2 level | CONSUMPTION | Current BOM for Buffered Materials | |
| P_ProposedBufferMatlBOM | via 3 levels | CONSUMPTION | Proposed Buffer Material BOM | |
| C_ProposedBufferMatlBOM | via 4 levels | CONSUMPTION | Proposed BOM for Buffered Materials |
ProposedLeadTime
(1 view)
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| P_ProposedBufferMatlBOM1 | via 2 level | CONSUMPTION | Proposed Buffer Material BOM |
Learn More
- Understanding Data Lineage in SAP S/4HANA
- SAP Tables vs CDS Views — Key Differences
- Understanding the SAP S/4HANA Data Model
- BSEG to ACDOCA: The Universal Journal Migration
- Business Partner Migration: KNA1/LFA1 to BUT000
- Material Document Migration: MSEG/MKPF to MATDOC
- How to Find the Right CDS View for an SAP Table
- Sales Document Status Migration: VBUP/VBUK Removal in S/4HANA
- CO Tables in S/4HANA: COEP, COBK, COSS, COSP to ACDOCA