BIDAM in KEKO

Table Field CK_BIDAT

Costing Date To (DE: KalkDatum bis)

BIDAM is a field in SAP table KEKO (Erzeugniskalkulation - Kopfinformationen). It represents "Costing Date To". Data element: CK_BIDAT. Available in 2 CDS view(s) as bidam.

Business Meaning

Description (EN)Costing Date To
Beschreibung (DE)KalkDatum bis
Data ElementCK_BIDAT
Key FieldNo

CDS Views & Technical Names (2)

KEKO.BIDAM is exposed in CDS views under the following technical name. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.

bidam (2 views)

ViewAccessVDMReleaseDescription
FCO_COST_EST_KEKO_VBAP_SDM direct PCC: Cost Estimate with Origin Sales Doc
FCO_COST_EST_SDM via 2 level Cost estimate with SDM field