Production Execution Duration (F2172)
With this app you can compare the planned and actual operation durations required for execution. The planned operation durations are defined in the manufacturing order and are calculated using the durations defined in the routing or master recipe. The time that was actually required for execution is recorded in the production confirmations. Using this app, you can easily compare these values. You can perform a step-by-step analysis for a specific time period and continuously fine-tune the production facility.
Production Execution Duration (F2172) is a SAP Fiori application of type Analytical. It uses 2 OData service(s). It is linked to 1 CDS view(s).
OData Services (2)
| Technical Name | Namespace | Version | Software Component |
|---|---|---|---|
| /SSB/SMART_BUSINESS_RUNTIME_SRV | /SSB/ | ||
| C_MFGORDEROPEXECDURNQRY_CDS |
Linked CDS Views (1)
| CDS View | VDM Layer | Description |
|---|---|---|
| C_MfgOrderOpExecDurnQry | CONSUMPTION | Mfg Order Operation Execution Duration - Query |
App Information
| Application Component | PP-FIO-SFC |
| Semantic Object | PPMOPERATIONPROCESSINGDURATION, ProductionOrderOperation |
| SAPUI5 Component | $k1547219344148$ * $ssuite.smartbusiness.runtime.s1$ |
| BSP Application | SBRT_APPSS1 |
| Business Catalog | SAP_SCM_BC_PRODN_PERF_MNTR |
| Business Roles | Production Planner |
| Technical Catalog | SAP_TC_SCM_PP_COMMON |
| Product | SAP S/4HANA (Private Cloud and On-Premise) |
Documentation
Overview
With this app you can compare the planned and actual operation durations required for execution. The planned operation durations are defined in the manufacturing order and are calculated using the durations defined in the routing or master recipe. The time that was actually required for execution is recorded in the production confirmations. Using this app, you can easily compare these values. You can perform a step-by-step analysis for a specific time period and continuously fine-tune the production facility.