CREADATE in SRMWFPATH

Table Field SRMWFCRDAT

Created On (DE: Erstellt am)

CREADATE is a field in SAP table SRMWFPATH (Workflow Process Route). It represents "Created On". Data element: SRMWFCRDAT. Available in 4 CDS view(s) as CreationDate.

Business Meaning

Description (EN)Created On
Beschreibung (DE)Erstellt am
Data ElementSRMWFCRDAT
Key FieldNo

CDS Views & Technical Names (4)

SRMWFPATH.CREADATE is exposed in CDS views under the following technical name. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.

CreationDate (4 views)

Date Process Route Created

ViewAccessVDMReleaseDescription
I_ProcessRoute direct BASIC Process Route
I_ChgRecordProcessRouteDEX via 2 level BASIC Change Record Process Route
I_ProcessRouteTP via 2 level TRANSACTIONAL Process Route Transactional Processing
C_ProcessRoute via 3 levels CONSUMPTION Process Route Consumption View

Other Tables with Field CREADATE (8)

TableData ElementKeyDescription
ISJPINVSUMHD ISJPCREADATE Invoice Summary Header
ISJPINVSUMIT ISJPCREADATE Line items for invoice summary
ISJPVIRTACCT ISJPCREADATE Virtual accounts
OIKLID CRDATE TAS active LIDs(NOTE:keep eq to DB OIKLIDW->append includes)
SCICHKV_HD SCI_UPDDAT Code Inspector: Check Variant
SIPT_LIKP SIPT_CREADATE Portugal: Digital Signature for Delivery Document
SRMWFPTHPS SRMWFPPCRD Process Route Item for Workflow
SRMWFSEARCH SRMWFCRDAT KEY Generated Table for View