MAINTSCHEDSIMULATIONSTARTDATE in RSH_D_MNTSCHDSIM

Table Field RSH_EAM_MAINT_SCHED_SIM_START

Start Date (DE: Startdatum)

MAINTSCHEDSIMULATIONSTARTDATE is a field in SAP table RSH_D_MNTSCHDSIM (Maintenance Scheduling Simulation Root). It represents "Start Date". Data element: RSH_EAM_MAINT_SCHED_SIM_START. Available in 10 CDS view(s) as MaintSchedSimulationStartDate.

Business Meaning

Description (EN)Start Date
Beschreibung (DE)Startdatum
Data ElementRSH_EAM_MAINT_SCHED_SIM_START
Key FieldNo

CDS Views & Technical Names (10)

RSH_D_MNTSCHDSIM.MAINTSCHEDSIMULATIONSTARTDATE is exposed in CDS views under the following technical name. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.

MaintSchedSimulationStartDate (10 views)

ViewAccessVDMReleaseDescription
I_RSHMaintSchedSimulation direct BASIC Maintenance Scheduling Simulation Root
I_RSHMaintSchedSimulationTP via 2 level TRANSACTIONAL Maint Scheduling Simulation Root TP
I_RSHMaintSchedSmltdOp via 2 level COMPOSITE Maint Scheduling Simulation Operations
P_RSHMaintSchedOpConfBase via 2 level CONSUMPTION
C_RSHMaintSchedSimlnSearch via 3 levels CONSUMPTION My Schedules for Enterprise Search
C_RSHMaintSchedSimulation via 3 levels CONSUMPTION My Schedules
P_RSHMaintSchedOpConfirmations via 3 levels CONSUMPTION Confirmations for operations added to schedule
ESH_N_RSH_MY_SCHEDULES via 4 levels
P_RSHMaintSchedOpTotalConf via 4 levels CONSUMPTION Total confirmed work against the operations
ESH_S_RSH_MY_SCHEDULES via 5 levels