PROJECTDEMANDOVERALLAMOUNT in PROJECTDEMAND

Table Field TV_PROJ_DMND_OVERALL_LIMIT

Overall Limit (DE: Gesamtlimit)

PROJECTDEMANDOVERALLAMOUNT is a field in SAP table PROJECTDEMAND (Enterprise Project Demand Root node). It represents "Overall Limit". Data element: TV_PROJ_DMND_OVERALL_LIMIT. Available in 8 CDS view(s) as ProjectDemandOverallAmount.

Business Meaning

Description (EN)Overall Limit
Beschreibung (DE)Gesamtlimit
Data ElementTV_PROJ_DMND_OVERALL_LIMIT
Key FieldNo

CDS Views & Technical Names (8)

PROJECTDEMAND.PROJECTDEMANDOVERALLAMOUNT is exposed in CDS views under the following technical name. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.

ProjectDemandOverallAmount (8 views)

Overall Limit

ViewAccessVDMReleaseDescription
R_ProjectDemand direct BASIC Project Demand
I_ProjectDemand via 2 level BASIC Project Demand
I_ProjectDemandTP via 2 level TRANSACTIONAL Project Demand - TP
A_ProjectDemand via 3 levels COMPOSITE Project Demand
C_MngProjectDemandMaterialTP via 3 levels CONSUMPTION Project Demand
C_MngProjectDemandServiceTP via 3 levels CONSUMPTION Manage Proj Dmnd Srvc Root view for UI
C_MngProjectDemandTP via 3 levels CONSUMPTION Manage Demands for All tab
I_ProjectDemandTP_2 via 3 levels TRANSACTIONAL Project Demand - TP

Other Tables with Field PROJECTDEMANDOVERALLAMOUNT (1)

TableData ElementKeyDescription
PROJDEMAND_D TV_PROJ_DMND_OVERALL_LIMIT Draft table for entity I_PROJECTDEMANDTP