VALIDITYDATE in ENGREDLINE

Table Field REDLINE_VALIDITY_DATE

Redlne Validity Date (DE: Redl.-GültigkDatum)

VALIDITYDATE is a field in SAP table ENGREDLINE (Engineering Redline). It represents "Redlne Validity Date". Data element: REDLINE_VALIDITY_DATE. Available in 3 CDS view(s) as ValidityDate.

Business Meaning

Description (EN)Redlne Validity Date
Beschreibung (DE)Redl.-GültigkDatum
Data ElementREDLINE_VALIDITY_DATE
Key FieldNo

CDS Views & Technical Names (3)

ENGREDLINE.VALIDITYDATE is exposed in CDS views under the following technical name. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.

ValidityDate (3 views)

ViewAccessVDMReleaseDescription
I_EngineeringRedline direct BASIC Engineering Redline
I_EngineeringRedlineTP via 2 level TRANSACTIONAL Engineering Redline TP
C_EngineeringRedline via 3 levels CONSUMPTION Engineering Redline Projection

Other Tables with Field VALIDITYDATE (5)

TableData ElementKeyDescription
PPS_PC_ACCOUNT_D ABAP.DATS Draft table for entity R_PPS_PURCONTRACCTASSIGNMENTTP
PPS_PO_ACCT_D ABAP.DATS Draft table for entity R_PPS_PURORDACCTASSIGNMENTTP
PPS_PR_ACCT_D ABAP.DATS Draft table for entity R_PPS_PURCHASEREQNACCTASSGMTTP
PRICAT_K001 PRIVALIDITYCHMG PRICAT: Catalog header
PTIMEOV1 HR_DATE KEY Overview of an Employee