CONFDPRODAVAILABILITYUTCDTETME in ATP_CONF_BEFORE

Table Field ATP_CNF_MAT_AVAIL_TIMESTAMP

Confirmed MAD (DE: Bestätigtes MBDAT)

CONFDPRODAVAILABILITYUTCDTETME is a field in SAP table ATP_CONF_BEFORE (ATP Confirmation Before Check). It represents "Confirmed MAD". Data element: ATP_CNF_MAT_AVAIL_TIMESTAMP. Available in 22 CDS view(s) as ConfdProdAvailabilityUTCDteTme, ATPCheckRelevantUTCDateTime, ATPCheckRelevantDate.

Business Meaning

Description (EN)Confirmed MAD
Beschreibung (DE)Bestätigtes MBDAT
Data ElementATP_CNF_MAT_AVAIL_TIMESTAMP
Key FieldNo

CDS Views & Technical Names (22)

ATP_CONF_BEFORE.CONFDPRODAVAILABILITYUTCDTETME is exposed in CDS views under the following technical names. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.

ConfdProdAvailabilityUTCDteTme (3 views)

ViewAccessVDMReleaseDescription
I_ATPConfirmationBeforeCheck direct BASIC ATP Confirmation Before Check
P_ABOPConfBeforeWthAddtnlUnits via 2 level COMPOSITE
P_ABOPRUNConfBeforeWthAddUnits via 2 level COMPOSITE

ATPCheckRelevantUTCDateTime (19 views)

ViewAccessVDMReleaseDescription
P_ABOPConfBfrRunByAvailyDate via 2 level COMPOSITE
P_ABOPRunAllConfirmations via 3 levels COMPOSITE
P_ABOPRunConfBfrByAvailyDate via 3 levels COMPOSITE
P_ABOPRunIterationAllConf via 3 levels COMPOSITE
P_ABOPRunIterationAllConf_2 via 3 levels COMPOSITE
P_ABOPRunConfirmationByRqmt via 4 levels COMPOSITE
P_ABOPRunIterationConfByRqmt via 4 levels COMPOSITE
P_ABOPRunIterationConfByRqmt_2 via 4 levels COMPOSITE
P_ABOPRunConfirmation via 5 levels COMPOSITE
P_ABOPRunIterationConfirm_2 via 5 levels COMPOSITE
P_ABOPRunIterationConfirmation via 5 levels COMPOSITE
I_ABOPRunConfirmation via 6 levels COMPOSITE Confirmation details of a requirement
I_ABOPRunConfirmation_2 via 6 levels COMPOSITE Confirmation Details of a Requirement
I_ABOPRunIterationConf_2 via 6 levels COMPOSITE Confirmation Details of a Requirement
I_ABOPRunIterationConfirmation via 6 levels COMPOSITE Confirmation details of a requirement
C_ABOPRunConfirmation via 7 levels CONSUMPTION Confirmation of a requirement in BOP
C_ABOPRunConfirmation_2 via 7 levels CONSUMPTION Confirmation of a Requirement in BOP
C_ABOPRunIterationConfirmation via 7 levels CONSUMPTION Confirmation of a requirement in BOP
C_ABOPRunItrtnConfirmation_2 via 7 levels CONSUMPTION Confirmation of a Requirement in BOP

ATPCheckRelevantDate (6 views)

ViewAccessVDMReleaseDescription
P_ABOPRunConfirmation via 5 levels COMPOSITE
P_ABOPRunIterationConfirmation via 5 levels COMPOSITE
I_ABOPRunConfirmation via 6 levels COMPOSITE Confirmation details of a requirement
I_ABOPRunIterationConfirmation via 6 levels COMPOSITE Confirmation details of a requirement
C_ABOPRunConfirmation via 7 levels CONSUMPTION Confirmation of a requirement in BOP
C_ABOPRunIterationConfirmation via 7 levels CONSUMPTION Confirmation of a requirement in BOP

Other Tables with Field CONFDPRODAVAILABILITYUTCDTETME (4)

TableData ElementKeyDescription
ATP_BM_R_CONF ATP_CNF_MAT_AVAIL_TIMESTAMP ATP Basic Method Requirement Confirmation
ATP_CONF_CMPSTNI ATP_CNF_MAT_AVAIL_TIMESTAMP ATP Check Confirmation Composition Item
ATP_R4D_CONFIRMA ATP_CNF_MAT_AVAIL_TIMESTAMP Confirmation in Release for Delivery
RSCCCHK_CONF ATP_CNF_MAT_AVAIL_TIMESTAMP Review Supply Demand-Based Capability Check Confirmation