REF_DATE_FOR_VALIDITY in SRF_CFG_PAR
Reference Date (DE: Referenzdatum)
REF_DATE_FOR_VALIDITY is a field in SAP table SRF_CFG_PAR (Report Configuration Parameter). It represents "Reference Date". Data element: SRF_REF_DATE_FOR_VALIDITY. Available in 2 CDS view(s) as ref_date_for_validity.
Business Meaning
| Description (EN) | Reference Date |
|---|---|
| Beschreibung (DE) | Referenzdatum |
| Data Element | SRF_REF_DATE_FOR_VALIDITY |
| Key Field | No |
CDS Views & Technical Names (2)
SRF_CFG_PAR.REF_DATE_FOR_VALIDITY is exposed in CDS views under the following technical name. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.
ref_date_for_validity
(2 views)
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| SRF_I_CFG_M | direct | Configuration Parameter Root view | ||
| SRF_C_CFG_M | via 2 level | Projection View for Config Param |
Learn More
- Understanding Data Lineage in SAP S/4HANA
- SAP Tables vs CDS Views — Key Differences
- Understanding the SAP S/4HANA Data Model
- BSEG to ACDOCA: The Universal Journal Migration
- Business Partner Migration: KNA1/LFA1 to BUT000
- Material Document Migration: MSEG/MKPF to MATDOC
- How to Find the Right CDS View for an SAP Table
- Sales Document Status Migration: VBUP/VBUK Removal in S/4HANA
- CO Tables in S/4HANA: COEP, COBK, COSS, COSP to ACDOCA