NET_CALENDAR_DURATION in MPE_EXEC_HOLD
Duration (Work Days) (DE: Dauer (Arbeitstage))
NET_CALENDAR_DURATION is a field in SAP table MPE_EXEC_HOLD (Production Hold). It represents "Duration (Work Days)". Data element: MPE_NET_CALENDAR_DURATION. Available in 7 CDS view(s) as CalendarBasedNetDurnInSeconds.
Business Meaning
| Description (EN) | Duration (Work Days) |
|---|---|
| Beschreibung (DE) | Dauer (Arbeitstage) |
| Data Element | MPE_NET_CALENDAR_DURATION |
| Key Field | No |
CDS Views & Technical Names (7)
MPE_EXEC_HOLD.NET_CALENDAR_DURATION is exposed in CDS views under the following technical name. Views reading the table directly are listed first; "via" marks views that pass the field on through intermediate views.
CalendarBasedNetDurnInSeconds
(7 views)
| View | Access | VDM | Release | Description |
|---|---|---|---|---|
| I_ProductionHoldBasic | direct | BASIC | Production Hold | |
| P_ProductionHold | via 2 level | COMPOSITE | ||
| P_ProductionHoldOpAndOpActy | via 2 level | COMPOSITE | ||
| P_ProductionHoldEnhcd | via 3 levels | COMPOSITE | ||
| P_ProductionHoldTP | via 4 levels | COMPOSITE | ||
| I_ProductionHoldTP | via 5 levels | TRANSACTIONAL | Manage Production Hold | |
| C_ProductionHoldTP | via 6 levels | CONSUMPTION | Manage Production Holds |
Other Tables with Field NET_CALENDAR_DURATION (3)
| Table | Data Element | Key | Description |
|---|---|---|---|
| MPE_OAC | MPE_NET_CALENDAR_DURATION | Operation Activity Confirmation | |
| MPE_OAI_LBR_ACTN | MPE_NET_CALENDAR_DURATION | Labor action of users during OA execution | |
| MPE_SFI_CONFIRM | MPE_NET_CALENDAR_DURATION | MPE SFI Confirmations (History of SFI Execution) |
Learn More
- Understanding Data Lineage in SAP S/4HANA
- SAP Tables vs CDS Views — Key Differences
- Understanding the SAP S/4HANA Data Model
- BSEG to ACDOCA: The Universal Journal Migration
- Business Partner Migration: KNA1/LFA1 to BUT000
- Material Document Migration: MSEG/MKPF to MATDOC
- How to Find the Right CDS View for an SAP Table
- Sales Document Status Migration: VBUP/VBUK Removal in S/4HANA
- CO Tables in S/4HANA: COEP, COBK, COSS, COSP to ACDOCA